We welcome our value customer to our Test Site, observing the Destructive Testing Process on the 37X7, 30mm Steel Wire Rope with Spelter Socketing; followed by a close-up view on the destructed test gear, together with the STL team.
To ensure accuracy and better control of the verified proof load on the test gears, STL introduced the DLM Digital Load Cell into its Load Testing protocol, providing the control to validate the Load Test Results with direct feedback on real time...
New MOM system requirements as mandated by MOM, Refer to the 3 key changes/further requirement for LA/LM registration for seamless processing of Test Certificates by our AE/PE
New WSH-MOM – e-Services system for management of “Statutory Equipment” - Lifting Equipment (LEs) and pressure vessels (PVs), will launch on 11 Aug 2023 (Friday) 10am.
Some of the important changes Statutory Equipment owners need to take note for this new implementation to ensure seamless operation on their end.



